Battery storage sizingStart with the duty.
Then size the battery.

MW and MWh describe different dimensions of a battery energy storage system. A useful design starts with what the system must do.

DURATION
Power, energy and time meet in an operating requirement.

Resus Perspectives · 30 October 2026 · Energy storage

“We need a battery” is the beginning of a brief. The engineering question is more precise: what must it deliver, at which measurement point, for how long, how often and under what conditions?

Power and energy answer different questions.

Power, measured in MW, describes the rate of charging or discharge. Energy, measured in MWh, describes the quantity stored or delivered within a defined boundary. Dividing energy capacity by power gives a nominal duration. The EIA explains this distinction and how different applications lead to different storage durations. Read the EIA explanation of battery duration.

That ratio is a useful first calculation. It does not, by itself, define a complete equipment specification or a guarantee at the grid connection. The measurement point and conditions must be explicit.

Define the boundary before comparing quotations.

In the example, the requirement is to deliver 50 MW continuously for two hours. If that obligation is measured at the grid connection, the design must account for the losses and auxiliary loads between the battery and that point. It must also state the usable state-of-charge window and the operating conditions.

A quotation expressed as nominal DC battery energy cannot be compared directly with a requirement for usable AC energy at the connection point. The useful comparison is the same duty, the same boundary and the same point in the project’s life.

Ask where the next charge comes from.

Discharging is only half of the cycle. The charging source, available power, permitted import, charging window and conversion losses shape whether the operating pattern can be repeated. Solar, wind and demand time series help reveal the difference between a plausible annual total and an achievable daily schedule.

Where several services are proposed, their requirements need to be reconciled. Energy reserved for one obligation may be unavailable for another at the same time. Our approach is to model the priorities and operating limits explicitly before treating multiple services as additive value.

Size for a life, not only a commissioning test.

The duty should identify expected cycling, temperature conditions, operating limits and the required performance over time. Battery degradation and replacement assumptions belong in the technical and commercial assessment. The System Advisor Model (SAM) includes models for temperature, operating conditions and degradation to support this kind of analysis. Explore the SAM battery storage model.

For procurement, the practical question is how the proposed warranty, maintenance plan and any augmentation strategy correspond to the intended duty. Assumptions used in the financial case should be traceable to the equipment specification and the acceptance criteria.

The battery is part of an electrical system.

PCS, transformers, switchgear, protection, controls and communications affect the integrated plant. The BMS and EMS serve different functions; their interfaces and responsibility boundaries should be clear. Site layout, thermal management, fire protection and emergency arrangements also need project-specific engineering.

Resus sees BESS as an integration question connecting generation, demand and the grid. Begin with time-series data and a defined service. Compare configurations against that service. Then bring equipment, safety, controls and lifecycle performance into one design basis.

The example illustrates energy arithmetic only. Final sizing and safety design require project data, equipment characteristics, applicable requirements and qualified engineering assessment.